The works that took place were the following: removal of the loose concrete, sandblasting and cleaning of the corroded reinforcement, application of corrosion inhibitor onto the reinforcement, application of surface applied corrosion inhibitor, concrete sections restoration using R3/R4 repair mortars, dowels and new steel reinforcement installation, construction of shotcrete jackets, crystalline technology coating application (XYPEX) for protection against corrosion, repair and replacement of steel elements and structures.
The methods followed and the materials and systems used were in accordance with relevant standards (mainly EN 1504) and the Greek Technical Guidelines (ΕΤΕΠ).