As part of the general restoration of the hotel, works regarding the strengthening, repair, and rehabilitation of the structural elements took place.
The works included foundation excavations, shotcrete jacketing, new cast in-situ concrete walls, elevator shafts, strengthening using steel plates and FRP plates and fabrics, connecting of adjacent buildings (expansion joints grouting and connection with shear bolts, and general repairs of the structural elements.
The special features of the project concern the tight schedule (< 2 months) and the variety of methods applied.
ENKA executed the project successfully and on schedule, in perfect collaboration with the client and the construction supervision.